Priming

Injection Test Bench · Live

System priming: Standby — hold the pump, watch the title fill

Pressure 0bar
Pump RPM 0
Calibration Standby

Features

What comes off the bench

Every pump leaves with a test sheet showing delivery at each check point, before and after. If the numbers do not land inside spec, it does not leave.

Bench test

Test before we quote

Your pump runs on a calibrated bench first. You see the fault on paper before anyone picks up a spanner, and you approve the work against real numbers.

ISO 4008 test procedure

Calibration

Delivery balanced element by element

Fuel volume is matched across every element to the manufacturer sheet, so no cylinder runs rich while its neighbour starves. Smoke drops, so does consumption.

±1% delivery tolerance

Rebuild

Wear parts out, genuine parts in

Plungers, barrels, delivery valves, seals and bearings replaced with OE or OE-equivalent parts. The body is reconditioned and pressure-tested to seal before reassembly.

12 months parts and labour

Injectors

Spray pattern you can look at

Opening pressure, back-leak and atomisation checked on every nozzle. Ultrasonic cleaning, new nozzles where wear calls for it, then a second run to confirm.

2,000 bar common rail rated

Process

Six stages, in this order

The order matters. Nothing is stripped before we have a baseline, and nothing ships before the calibration run is signed. Every stage leaves a record you can ask for.

  1. 01

    Intake and wash

    Pump is tagged to your job number, externally cleaned, and photographed as received.

    Job number
  2. 02

    Baseline bench run

    Run as-is on the bench to record what it actually does. This sheet is the one we quote against.

    Baseline sheet
  3. 03

    Teardown and inspection

    Stripped to components, each wear surface measured and compared against service limits.

    Quote to approve
  4. 04

    Rebuild

    New wear parts fitted, housing reconditioned, assembly torqued to spec in a clean room.

    Parts list
  5. 05

    Calibration run

    Timing and delivery set across the full speed range until every check point sits inside tolerance.

    Calibration sheet
  6. 06

    Seal, sheet and dispatch

    Wire-sealed, before and after sheets attached, warranty registered against the pump serial.

    Warranty record

Specs

Bench capability

What the equipment can actually measure, and what we can put on it. If your pump is not on this list, send the serial and we will tell you straight.

Test bench

Test pressure range
0 – 1,850 bar
Drive speed
0 – 4,000 rpm
Drive power
30 kW
Measuring accuracy
±1.0 %
Calibration fluid
ISO 4113
Fluid temperature
40 ±2 °C
Test standards
ISO 4008 / 4010

Pumps and systems serviced

Bosch
VE · VP44 · P7100 · A / P / MW
Denso
HP0 · HP3 · HP4
Delphi
DP200 · DPC · DPA
Stanadyne
DB2 · DB4
Zexel
Inline and rotary
Common rail
Rails and injectors to 2,000 bar
Unit injectors
EUI · EUP

Support

After it leaves the shop

Standard turnaround

3 working days

From approval of the quote, not from drop-off.

Express service

24 hours

Fleet vehicles off the road. Call before you send it.

Warranty

12 months

Or 100,000 km on rebuilt pumps, whichever lands first.

Collection

Free

Within Dubai and Sharjah for two units or more.

Book

Get your pump on the bench

Send the pump serial and we will confirm whether it is a service, a rebuild, or not worth either. No charge for the assessment call.